[Gllug] Was there Power Outage at Telehouse?
Chris Bell
chrisbell at overview.demon.co.uk
Fri Aug 18 21:44:54 UTC 2006
On Thu 17 Aug, Matthew Thompson wrote:
>
> On 17 Aug 2006, at 16:18, - Tethys wrote:
> >
> > Not so. Redundant PDUs per room, feeds from both PDUs to each cabinet,
> > and multiple power supplies per server, taking feeds from both PDUs.
> > Simple, really.
>
> Can you safely do this across phases?
>
> M at t :o)
Not only yes, but you can have three phase systems which are more compact
than single phase. It is sometimes the only way to install a heavy duty unit
such as a charger for a fork lift truck without going over the maximum
supply current for the building.
--
Chris Bell
--
Gllug mailing list - Gllug at gllug.org.uk
http://lists.gllug.org.uk/mailman/listinfo/gllug
More information about the GLLUG
mailing list