[Liverpool] Replacement PC for LSC
Neil Bothwick
neil at stfw.net
Wed Aug 5 10:33:40 UTC 2009
On Fri, 31 Jul 2009 14:47:00 +0100, Andrew Williams wrote:
> A switch is something we defo need, at the moment they've got a 10mbit
> thing with a BNC connector on it and a heathly "toasty" colouring around
> the power connector :)
I have a Netgear FS108 switch surplus to requirements. It's one of the
metal bodied one but I've no idea where the PSU is. It needs 12V/1.2A
from a typical wart PSU.
--
Neil Bothwick
If weather bureaus were honest, they would call themselves non prophet
organizations
-------------- next part --------------
A non-text attachment was scrubbed...
Name: signature.asc
Type: application/pgp-signature
Size: 198 bytes
Desc: not available
Url : http://mailman.lug.org.uk/pipermail/liverpool/attachments/20090805/dda5521b/attachment.pgp
More information about the Liverpool
mailing list